Wednesday, 24 October 2018

Train 18, India’s first engine-less train, set to hit tracks on Oct 29

The swanky 16-coach prototype without a locomotive (engine) will cut travel time by 15 per cent compared to the Shatabdi
Train 18
Train 18, the country’s first engine-less train which is being regarded as a successor to the 30-year-old Shatabdi Express, is set to hit the tracks for trials on October 29. Driven by a self-propulsion module sans a separate locomotive, the train, capable of running at a speed of up to 160 kmph, comes with technical features for enhanced quick acceleration.
The swanky 16-coach prototype without a locomotive (engine) will cut travel time by 15 per cent compared to the Shatabdi. Developed by the city-based Integral Coach Factory in 18 months, the full AC train is designed in such a way that passengers can have a look at the driver’s cabin.
ICF General Manager Sudhanshu Mani told PTI that it cost nearly Rs 1 billion to build the prototype and subsequent production would bring down the cost. “It will be unveiled on October 29, then it will do three to four days of trial outside the factory and then will be handed over to Research Design and Standards Organisation (RDSO) for further trials,” he said.
The self-propelled train, fitted with CCTV cameras, would have two executive compartments in the middle with 52 seats each, whereas trailer coaches would have 78 seats each. It has a potential to travel up to the speed at 160 kmph as against 130 kmph of Shatabdi and would result in the travel time being reduced by around 15 per cent once the tracks are fit to suit Train 18’s speed.| Read More 

No comments:

14th BRICS summit to review current global issues, reach key agreements

  At the   14th BRICS summit   which is to be hosted by China in a virtual mode on 23-24 June, the member nations will review the current gl...